installed the manual steering box today, also got the GN rear so i can swap that in, and installed the fuel tank and intercooler
Saturday, June 22, 2013
Thursday, June 20, 2013
Wednesday, June 19, 2013
Monday, June 17, 2013
junkyard dipstick and wastegate placement
put in a junkyard dipstick for the trans, fits perfect, now i can fill and check the level for much cheaper than a 90 dollar flexible one. also mounted the wastegate i got the other day, now i have to pull mostly everything out and build the trans and do the downpipe and etc.
Sunday, June 16, 2013
Saturday, June 15, 2013
Friday, June 14, 2013
Wednesday, June 12, 2013
starting hotside
started to mock up the hot side, well, cut and bolted in my manifolds, then held some pipes in to get ideas and moved the turbo around, waiting on some Vbands and i will be able to tack some stuff up. thursday night i am sure there will be an update
Sunday, June 9, 2013
Saturday, June 8, 2013
Friday, June 7, 2013
studded my 6.0
tonight i threw in my chinese head studs into this painted pretty junkyard 6.0
getting ready to pickup the surprise next project car saturday morning, here are some shots of the pretty head stud install process
getting ready to pickup the surprise next project car saturday morning, here are some shots of the pretty head stud install process
Thursday, June 6, 2013
shipping used bearings to a friend in need
a friend cameron Vic actually hurt some of his bearings and is going to swap them out, so i sent him these in a care package, harrys seasoned race bearings lol
Tuesday, June 4, 2013
leaf spring removal
needed to pull an extra leaf spring out of this 80 camaro for my friends swap car coming up, going to be putting an LS in a 79 nova 4 door!