Lots of progress today kiddies, clutch, headers, crossover pipe installed, motor dropped in, transmission installed, drive shaft hooked up, starter, wastegate installed, oil relocation kit installed, power steering hooked up and installed, clutch line adjusted, boost controller installed... almost everything. Basically gotta drop in the radiator, pour in some coolant and oil, and double check everything, install the compressor piping, upper intake manifold, distributor, plugs and wires, and start it up and set the timing, if all is well we can put the wheels on and take her for a quick tuning run.
More progress and pics tomorrow.
No comments:
Post a Comment