Friday, November 22, 2013

tons done today, even drove the truck around

fuel rail spacers yesterday from lowes haha, trans filter for the 80e, put the pan on the 80e, its ready to go.
put the last coupler i needed on the front end and got all the clamps on it, put the grille and everything back on, buttoned and zip tied everything, installed the wideband in the car, even checked the fluid and took it for a drive, in the video i dont have the reference hooked up to the wastegate, later i got it plugged in and it makes 12psi right now but the stock fuel pump cant keep up with that at all.

drilled and tapped the intake piping for the meth kit. 
going to finish that up this weekend when we do the 80e swap and also drop the stock fuel tank and install the walbro 400 in the tank.

should be ready to get nuts soon!







No comments:

Post a Comment